CONSTRUCTIV

Data Center Construction Integration Manager - Constructiv

LocationPhoenix, AZ
Job TypeFull-time

About This Job

We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery.

Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers

As we continue to expand, Constructiv is building a pipeline of skilled construction professionals for future opportunities in the United States. While we currently do not have immediate openings, we want to connect with talented individuals in the data center construction industry who are open to exploring roles with us when the time is right.

Travel : Travel is required – up to 90%. 90% is required due to assignment being on site/physical location, living in temporary housing. Onsite is Monday - Friday with occasional off hours work, nights and weekends as needed.

Current focus is on candidates located in the following areas:


Irving, TX


Des Moines, IA


Wenatchee, WA


Major Responsibilities

Oversee the full integration process post base-building completion to ensure data centers are “Ready for Network Install” (RNI) and “Ready for Server Install” (RSI).

Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs.
Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN. Ensure compliance with technical specifications and timelines.
Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols.
Daily Operations:
+ 45% Onsite fieldwork including site walks, progress checks, and safety meetings with field teams. + 55% Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.).
Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress.
Track and report on project status, RFIs, constraints, dependencies, and safety compliance. Provide weekly updates in accordance with organizational standards.
Meeting project deadlines aligned with business and customer needs.
Promoting and maintaining a safe working environment.


Minimum Job Requirements


Education

High school diploma or GED required.


Work Experience

5–7 years of experience in data center or mission-critical construction project management.

5+ years in Construction Management, Documentation & Professional Communication & Telecom/Network System Integration
Proven ability to lead integration of telecom and network systems in large-scale construction projects.
Proficiency in analyzing project schedules and tracking technical scope.


Knowledge / Skills / Abilities

Excellent documentation and professional communication skills.
Advanced experience with Microsoft Office 365 or equivalent enterprise tools.


Preferred Job Requirements


Education

Degree in Construction Management, Telecommunications, Engineering, or a related field.


Certification / License

PMP, LEED, or RCDD certification.

OSHA 30 and/or NFPA 70E certification.
PMI- PMP (Project Management Professional)
BICSI- DCDC (Data Center Design Consultant)
Uptime Institute ATD (Accredited Tier Designer)


Work Experience

Familiarity with commercial lease agreements and associated construction deliverables.


Physical Requirements and Working Conditions


PHYSICAL DEMANDS :


Office Environment (Includes field sales):

While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion, the incumbent may be required to stoop, bend, or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision, and the ability to adjust focus. Occasional travel. (If travel percentage is required beyond occasional or is a regular part of the job, include “Up to 90% travel and valid Driver’s License required.”)

Production Environment (Includes professionals who are active on the shop floor) (For Field Technicians):

While performing the duties of this job, the employee is regularly required to stand. The employee is frequently required to use hands to manipulate objects, tools, or controls; and to talk and hear. The employee is regularly required to walk, stoop, crouch, bend and reach above shoulders. The employee must frequently lift and/or move up to 50 pounds unassisted and up to 100 pounds with assistance, waist high, up to 10 feet away. This job's specific vision abilities include close vision, distance vision, peripheral vision, and depth perception. While performing the duties of this job, the employee will be working in the typical conditions of a manufacturing environment, including seasonal variations in temperatures and occasional exposure to manufacturing fumes or byproducts. The employee must comply with the assigned location PPE requirements, including but not limited to safety glasses, hearing protection, appropriate gloves, clothing, and shields for required tasks, and closed-toed or safety shoes as required by facility safety policies. The employee must be able to work in varying weather conditions including extreme heat, snow, and ice. The employee may be required to obtain a DOT Medical Card and have the ability to drive a heavy-duty truck on a daily basis.

Physical Demands : While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion the incumbent may be required to stoop, bend or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision and ability to adjust focus. Occasional travel.

“We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, national origin, disability status, protected veteran status, or any other characteristic protected by law.”

Similar Jobs

company-logo

Data Center Construction Integration Manager - Constructiv

CONSTRUCTIV
Job TypeFull-time
 
Phoenix, AZ
30 days ago
company-logo

Project Safety Engineer - Data Center Construction

The Weitz Company / Contrack Watts, Inc.
Job TypeFull-time
 
Cedar Rapids, IA
about 1 month ago
company-logo

Project Safety Manager - Data Center Construction

The Weitz Company
Job TypeFull-time
 
Cedar Rapids, IA
about 1 month ago
company-logo

Project Safety Engineer - Data Center Construction

The Weitz Company
Job TypeFull-time
 
Cedar Rapids, IA
about 1 month ago
company-logo

Construction Manager - Constructiv

Generac
Job Typefull_time
Salary
$131200 - $196900
Denver, CO
23 days ago
company-logo

Project Manager, Data Center

ADB Companies, LLC
Job Typefull_time
 
Texas, United States
9 days ago
company-logo

Scheduler - Data Center Construction

Turner & Townsend Pty Limited
Job TypeFull-time
 
Atlanta, GA
about 1 month ago
company-logo

Assistant Project Manager - Data Center

Structure Tone
Job TypeFull-time
 
Dallas, TX
about 1 month ago
company-logo

Assistant Project Manager - Data Center

STO Building Group
Job TypeFull-time
 
Dallas, TX
about 1 month ago
company-logo

Field Project Engineer-Data Centers

Generac
Job Typefull_time
 
Waukesha, WI
19 days ago
company-logo

enior Scheduler - Data Center Construction

Turner & Townsend Pty Limited
Job TypeFull-time
 
Conyers, GA
about 1 month ago
company-logo

enior Scheduler - Data Center Construction

Turner & Townsend
Job TypeFull-time
 
Conyers, GA
about 1 month ago
company-logo

Project Manager Owner's Representative (Data Center Construction)

KALCON
Job TypeFull-time
Salary
$140000 - $200000
Cedar Rapids, IA
about 1 month ago
company-logo

Project Manager Owner's Representative (Data Center Construction)

KALCON
Job Typefull_time
Salary
$140000 - $200000
IA
about 1 month ago
company-logo

Data Center Critical Infrastructure Specialist

CPS Energy
 
San Antonio, TX
about 1 month ago
company-logo

College Intern - Data Center Operations

Salt River Project
Job Typeinternship
 
Tempe, AZ
12 days ago
company-logo

Construction Management Resource Coordinator

TC Energy
Job Typefull_time
 
Houston, TX
18 days ago
company-logo

Electrical Engineer - Data Centers

Intersect Power
Job Typefull_time
 
21 days ago
company-logo

Construction Operations Manager

Acculevel Inc.
Job TypeFull-time
 
Rossville, IN
about 1 month ago
company-logo

Construction Operations Manager

Portland Pump Company
Job TypeFull-time
Salary
$89000 - $95000
Scarborough, ME
about 1 month ago

Trending Jobs

company-logo

Foundry Professionals

Penticton Foundry
Job TypeFull-time
 
British Columbia, Canada
about 1 month ago
company-logo

Deckhand

Ballard Marine Construction
Job TypeFull-time
 
Bradenton, FL
about 1 month ago
company-logo

Apprentice Lineman

N Line Electric
Job TypeFull-time
Salary
$68640 - $106080
Longmont, CO
30 days ago
company-logo

HSE Operations Manager

ProPetro Services, Inc
Job Typefull_time
 
Midland, TX
19 days ago
company-logo

Lineman, Apprentice

Imperial Irrigation District
Job TypeFull-time
Salary
$82706 - $95679
Imperial, CA
about 1 month ago
WO

Field Service Technician

Westar Oilfield Rentals Inc
Job TypeFull-time
 
Fort St. John, BC
26 days ago
company-logo

EAST VALLEY NIGHT BILINGUAL JANITORIAL UNIT MANAGER( MESA,CASA GRANDE, GILBERT)

ENVIRONMENT CONTROL
Job TypeFull-time
Salary
$41600 - $47840
Mesa, AZ
about 1 month ago
company-logo

Manager, IT - BMO

Constellation
Job Typefull_time
 
Kennett Square, PA
26 days ago
company-logo

Inventory Materials Specialist

HF Sinclair
Job Typefull_time
 
Artesia, NM
12 days ago
company-logo

LCL66 Apprentice Lineman Distribution

CenterPoint Energy
Job TypeFull-time
 
Houston, TX
about 1 month ago
company-logo

Quality Plus Store Associate

Quality Oil Company LLC
Job TypePart-time, Full-time
 
Halifax, VA
30 days ago
LE

Préposé(e) à l'entretien ménager

Les Entretiens Uni-Net Inc.
Job TypePart-time
 
Montréal, QC
about 1 month ago
company-logo

NIGHT BILINGUAL JANITORIAL SUPERVISOR(SOUTH EAST VALLEY)

ENVIRONMENT CONTROL
Job TypeFull-time
Salary
$41600 - $47840
Gilbert, AZ
about 1 month ago
company-logo

Heavy Truck Driver

Halliburton
Job TypeFull-time
 
Bossier City, LA
about 1 month ago
AW

Water Well Driller

Able Well Drilling
Job TypeFull-time
Salary
$45760 - $83200
Bowling Green, OH
about 1 month ago
company-logo

HVAC Sales Comfort Advisor

Quality Degree, Inc.
Job TypeFull-time
Salary
$64924 - $200000
Royersford, PA
about 1 month ago
company-logo

Quality Inspector

ACCIONA
Job Typefull_time
 
British Columbia, Canada
26 days ago
company-logo

Accounts Payable Clerk

Drax
Job TypeFull-time
 
Monroe, LA
about 1 month ago
company-logo

Mechanic Class B (Day Shift)

Hydro
Salary
$66560 - $66560
Industry, CA
24 days ago
company-logo

Electrician (Residential Solar)

Freedom Forever
Job TypeFull-time
 
Tucson, AZ
about 1 month ago

Notice: The inclusion of job postings or company information on our platform does not imply endorsement, partnership, or affiliation. Listings may include publicly available roles from various sources, and companies shown may not have a direct relationship with Energy Hire.